Home Is Where
Your Heart Is

TO BUY - TOWNHOUSE T3 GAIA PRAIAS

759.000 EUR

REF: A155364

Specifications

  • Category
  • Villa
  • Energy Certificate
  • Em curso
  • Estado
  • Under construction
  • Building year
  • 2027
  • Nb of floors
  • 3
  • Gross Area
  • 267 sqm
  • Bedrooms
  • 3
  • Suites
  • 1
  • Bathrooms
  • 3

Specifications

  • Category
  • Villa
  • Energy Certificate
  • Em curso
  • Estado
  • Under construction
  • Building year
  • 2027
  • Nb of floors
  • 3
  • Gross Area
  • 267 sqm
  • Bedrooms
  • 3
  • Suites
  • 1
  • Bathrooms
  • 3

Features

  • General
  • Laundry
  • Double glazing
  • Solar orientation: West, East
  • Nº Parking Lots: 3
  • Floors: 3
  • Garage Type: Box
  • Electric shutters
  • Built year: 2027
  • Inside
  • Walk-in wardrobe
  • Air conditioning
  • Fitted wardrobes
  • Heat pump
  • Equipped kitchen
  •  
  • Outdoor
  • Courtyard
  • Garden
  • Balcony

Additional information

267m2
3-story house

Lower floor:
Hall 33m2
Laundry room 6m2
Parking 34m2

Ground floor:
Living room 41m2
Equipped kitchen 14m2
Bathroom 3m2
Hall 9m2
Pantry 3m3
Balcony 11m2
Patio 36m2
Garden 62m2

Upper floor:
Suite 25m2 (Bedroom 17 + WC 4m2 + Closet 4m2)
Bedroom 14m2
Bedroom 14m2
WC 4m2
Hall 10m2
2 Balconies (9m2 + 9m2)

Aluminum window frames with anodized finish, thermal break, and double glazing
Lacquered woodwork
Multilayer flooring with wood finish
ROCA sanitary ware
Lacquered kitchen furniture
Silestone countertop ref. pearl jasmine
Siemens appliances
Daikin ducted air conditioning
Aerothermal heat pump for DHW
Integrated lighting and blind control system
Pre-installation for electric vehicle charging
Solar orientation: East/West
Energy rating: pending

3-bedroom house with private garden, separate laundry room, and garage. Inside, the rooms are spacious and bright with cozy balconies and large windows that open directly onto the surrounding green spaces.
The construction stands out for its attention to detail, high-quality materials, and environmental and energy efficiency concerns, combining the aesthetic care of contemporary architecture with comfort and durability.
It is located near Miramar beach with all essential services in the surrounding area and access to the main transport links to the city of Porto, both by car and train.
Expected completion date: September 2027

SC
  • TO BUY  - TOWNHOUSE T3  GAIA PRAIAS
  • TO BUY  - TOWNHOUSE T3  GAIA PRAIAS
  • TO BUY  - TOWNHOUSE T3  GAIA PRAIAS
  • TO BUY  - TOWNHOUSE T3  GAIA PRAIAS
  • TO BUY  - TOWNHOUSE T3  GAIA PRAIAS
  • TO BUY  - TOWNHOUSE T3  GAIA PRAIAS
  • TO BUY  - TOWNHOUSE T3  GAIA PRAIAS
  • TO BUY  - TOWNHOUSE T3  GAIA PRAIAS
  • TO BUY  - TOWNHOUSE T3  GAIA PRAIAS

Additional information

267m2
3-story house

Lower floor:
Hall 33m2
Laundry room 6m2
Parking 34m2

Ground floor:
Living room 41m2
Equipped kitchen 14m2
Bathroom 3m2
Hall 9m2
Pantry 3m3
Balcony 11m2
Patio 36m2
Garden 62m2

Upper floor:
Suite 25m2 (Bedroom 17 + WC 4m2 + Closet 4m2)
Bedroom 14m2
Bedroom 14m2
WC 4m2
Hall 10m2
2 Balconies (9m2 + 9m2)

Aluminum window frames with anodized finish, thermal break, and double glazing
Lacquered woodwork
Multilayer flooring with wood finish
ROCA sanitary ware
Lacquered kitchen furniture
Silestone countertop ref. pearl jasmine
Siemens appliances
Daikin ducted air conditioning
Aerothermal heat pump for DHW
Integrated lighting and blind control system
Pre-installation for electric vehicle charging
Solar orientation: East/West
Energy rating: pending

3-bedroom house with private garden, separate laundry room, and garage. Inside, the rooms are spacious and bright with cozy balconies and large windows that open directly onto the surrounding green spaces.
The construction stands out for its attention to detail, high-quality materials, and environmental and energy efficiency concerns, combining the aesthetic care of contemporary architecture with comfort and durability.
It is located near Miramar beach with all essential services in the surrounding area and access to the main transport links to the city of Porto, both by car and train.
Expected completion date: September 2027

SC