go to

Home Is Where
Your Heart Is

TO BUY - T1 MATOSINHOS SUL

385.000 EUR

REF: A155424

Specifications

  • Category
  • Apartment
  • Energy Certificate
  • Em curso
  • Estado
  • Under construction
  • Building year
  • 2028
  • Floor
  • 4
  • Gross Area
  • 60 sqm
  • Bedrooms
  • 1
  • Suites
  • Bathrooms
  • 1

Specifications

  • Category
  • Apartment
  • Energy Certificate
  • Em curso
  • Estado
  • Under construction
  • Building year
  • 2028
  • Floor
  • 4
  • Gross Area
  • 60 sqm
  • Bedrooms
  • 1
  • Suites
  • Bathrooms
  • 1

Features

  • General
  • Storage / utility room
  • Double glazing
  • Solar orientation: West
  • Garage Type: Interior
  • Nº Parking Lots: 1
  • Built year: 2028
  • Inside
  • Open kitchen
  • Heat pump
  • Air conditioning
  • Fitted wardrobes
  • Equipped kitchen
  •  
  • Outdoor
  • Condominium garden

Additional information

60m2
4th floor with lift

Living room with integrated kitchen 22m2
Equipped kitchen
Room 16m2
WC 5m2
Hall's (5m2 + 3m2)

T1 integrated in a new development under construction, located in the heart of Matosinhos Sul and only 5 minutes from the beach. It includes a private garden, a rooftop with wide views, and a condominium room.
In addition to its sophisticated architecture and premium finishes, this apartment also has 1 parking space and 1 storage room.
Expected completion date: end 2028

SM
  • TO BUY  - T1  MATOSINHOS SUL
  • TO BUY  - T1  MATOSINHOS SUL
  • TO BUY  - T1  MATOSINHOS SUL
  • TO BUY  - T1  MATOSINHOS SUL
  • TO BUY  - T1  MATOSINHOS SUL
  • TO BUY  - T1  MATOSINHOS SUL
  • TO BUY  - T1  MATOSINHOS SUL
  • TO BUY  - T1  MATOSINHOS SUL

Additional information

60m2
4th floor with lift

Living room with integrated kitchen 22m2
Equipped kitchen
Room 16m2
WC 5m2
Hall's (5m2 + 3m2)

T1 integrated in a new development under construction, located in the heart of Matosinhos Sul and only 5 minutes from the beach. It includes a private garden, a rooftop with wide views, and a condominium room.
In addition to its sophisticated architecture and premium finishes, this apartment also has 1 parking space and 1 storage room.
Expected completion date: end 2028

SM