
BRITO LIVING
REF: A154483


Features
A building of contemporary architecture, with a high standard of construction quality, this is how this project was born, with its straight lines, use of noble and sober materials such as wood and donkey bricks, which give it its uniqueness.
This project privileges access to beaches and leisure areas, as well as the comfort of living just a few minutes from the city center. It is located 1 minute from the beach, offering a "slowliving" experience, and close to services.
As far as the interior areas are concerned, the social areas always make it possible to create two large living and dining spaces with permanent access to the kitchen, either with an open-plan island or with the possibility of a sliding door, equipped with state-of-the-art appliances. Private areas with built-in closets or walking closets, depending on the type of apartment.
All the apartments have been designed for optimum thermal and acoustic comfort, with minimalist windows by Cortizo, water heating with a heat pump and solar panels, central heating with fan coils to heat and cool the house.
All types have a garage and electric charging point.
Estimated completion date: June 2026.
RS
This project privileges access to beaches and leisure areas, as well as the comfort of living just a few minutes from the city center. It is located 1 minute from the beach, offering a "slowliving" experience, and close to services.
As far as the interior areas are concerned, the social areas always make it possible to create two large living and dining spaces with permanent access to the kitchen, either with an open-plan island or with the possibility of a sliding door, equipped with state-of-the-art appliances. Private areas with built-in closets or walking closets, depending on the type of apartment.
All the apartments have been designed for optimum thermal and acoustic comfort, with minimalist windows by Cortizo, water heating with a heat pump and solar panels, central heating with fan coils to heat and cool the house.
All types have a garage and electric charging point.
Estimated completion date: June 2026.
RS



Availability
You might also like...



